Instant download on Etsy · Works in Excel and free Google Sheets
Visit the Etsy shop

Excel and Google Sheets template

Change order template for Excel, with an AR tracker

Log every change order, print a signed form in seconds, and see who still owes you. One file, no macros, no subscription.

8 tabs in one file

  • Start Here
  • Job Money Dashboard
  • Change Order Log
  • Subcontractor Tracker
  • AR Tracker
  • Bid Log
  • Printable Change Order Form + Settings

Who it's for

For contractors who are tired of chasing money

If your change orders live in texts, emails and the back of a truck seat, this is for you. I built it for remodelers, builders and specialty trades who do extra work and then wait too long to get paid for it.

Two things quietly cost contractors the most. One is work done without a signed change order. The other is a balance nobody followed up on. This change order template for Excel handles the first, and the built-in AR tracker handles the second, so both sit in the same file.

You don't need to be a spreadsheet person. Sample jobs are already filled in so you can see how everything connects. Look around, clear them out, then add your own.

What's inside

What's in the change order template and AR tracker

Start Here

A short walk through setup, plus a 15-minute weekly money check.

Job Money Dashboard

Totals, unbilled change orders, client balances and late payments in one place, with charts of receivables by age and change orders by status.

Change Order Log

Type a CO number and the Printable Change Order Form fills in for you, with signature lines ready for the client.

Subcontractor Tracker

Keep an eye on insurance certificate expiration, W-9 status, retainage and lien waivers for every sub.

AR Tracker

Billed, retainage and net due for each invoice, sorted into aging buckets: current, 1 to 30, 31 to 60 and over 60 days.

Bid Log and Settings

Record the bids you send and watch your win rate. Settings holds the lists the rest of the file uses.

How it works

Set it up once, check it once a week

Download

Buy on Etsy and download the file. Open it in Excel, or upload it to Google Drive and open it with Google Sheets.

Set up once

Clear the sample jobs and add your own. Plan on about 10 minutes.

Log changes

When extra work comes up, add a line to the Change Order Log and print the form.

Weekly money check

Spend 15 minutes a week on the dashboard and the AR Tracker, then call the people who owe you.

Questions

Change order template FAQ

Do I need Excel?

No. It works in Excel and in free Google Sheets. Upload the file to Google Drive and open it with Sheets. There are no macros.

How does the printable change order form work?

Type a CO number in the Change Order Log and the Printable Change Order Form fills in with that change order. It has signature lines, so you can print it and get it signed.

Does it track retainage and aging?

Yes. The AR Tracker shows billed, retainage and net due, and sorts what's owed into current, 1 to 30, 31 to 60 and over 60 days.

Is there a subscription?

No. It's a one-time download from Etsy. No subscription, and no macros.

Can I use it with the job costing spreadsheet?

They work well side by side. The job costing spreadsheet tracks budget vs actual by cost code, and this file tracks the change orders and the money you're owed.

Instant download

Get the change order template

It's on Etsy, where you'll see the current price and the full listing.

Get it on Etsy